Ministry of Rural Rehabilitation and Development
Two Bridges, Takhar
Construction of two reinforced-concrete bridges, 19 m and 80 m long.
Scope of work
- 19 m bridge
- 80 m bridge
- Approaches and river training
Construction of two reinforced-concrete bridges, 19 m and 80 m long.