Ministry of Public Works
Ahmad Khail–Zazai Road, Paktia
Rehabilitation of the road from Ahmad Khail through Zazai toward the Pakistan border, chainage 18+000 to 35+375, with an asphalt surface.
Scope of work
- 17.4 km of road rehabilitation
- Asphalt surfacing
- Culverts and side drains